Construction Practices
Good concrete can still be ruined in the ninety minutes after it leaves the mixer. This guide covers the practices that decide whether placement succeeds — treating construction joints properly, respecting the 1.5 m free-fall guidance, curing long enough for the cement actually used, striking formwork at the right age, and protecting pours from heat and cold per IS 7861.
The 10 most-asked questions — click any question for the full code-referenced answer
- C-1 What is the minimum curing period for OPC and PPC concrete as per IS 456?
- C-2 What is the recommended cover for different structural members?
- C-3 How is formwork removal time determined for beams, slabs, and columns?
- C-4 What is the maximum free-fall height allowed for concrete placement?
- C-5 What are construction joints and how should they be treated?
- C-6 How should cold joints be prevented during large pours?
- C-7 What is the importance of compaction and how is it achieved?
- C-8 What precautions should be taken for concreting in hot weather?
- C-9 What precautions should be taken for concreting in cold weather?
- C-10 What is the recommended procedure for de-shuttering vertical and horizontal members?
Calculators for this category
All answers live in one searchable FAQ — use the search box to match your exact situation, or jump straight into a category.
Open the full FAQ