QA/QC Practices
Quality assurance is the system that prevents defects; quality control is the measurement that proves it worked. This guide collects the questions our consulting and training clients ask most about running QA/QC on Indian construction sites — how often to cast cubes on an RMC pour, what IS 456 Table 11 actually requires before concrete is accepted, when a low result becomes a non-conformity, and how trial mixes relate to an approved design mix.
The 10 most-asked questions — click any question for the full code-referenced answer
- A-1 What is the difference between Quality Assurance (QA) and Quality Control (QC)?
- A-2 How often should cube tests be conducted on an RMC pour?
- A-3 What is the acceptance criteria for 28-day compressive strength as per IS 456?
- A-4 How many cubes should be cast per sample as per IS 516?
- A-5 What is the role of a Quality Plan in construction projects?
- A-6 How is compressive strength tested as per IS 516?
- A-7 What are common causes of low cube strength and how are they investigated?
- A-8 How should concrete cubes be cured before testing?
- A-9 What is the difference between trial mixes and approved mix designs?
- A-10 How are non-conformities (NCRs) documented and closed?
Calculators for this category
All answers live in one searchable FAQ — use the search box to match your exact situation, or jump straight into a category.
Open the full FAQ