Curing Log
Day-by-day curing evidence per member — method, weather, actions and cumulative days against the IS 456 minimum.
Format ref: CI-CURING-LOG
Page ____ of ____
Curing Log
IS 456:2000 Cl 13.5, 13.5.1, 13.5.2
Day-by-day curing evidence per member — method, weather, actions and cumulative days against the IS 456 minimum.
| Member / location | Date cast | Curing method (ponding/hessian/spray/compound) | Day 1 action & by whom | Day 2 | Day 3 | Day 4 | Day 5 | Day 6 | Day 7 (min — OPC) | Days 8–10 (blended/SCM) | Interruptions & reason | Verified by |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
Note: Minimum period: 7 days OPC; 10 days with blended cements/SCMs; extendable to 14 days in hot/arid or where specified (Cl 13.5). Membrane curing compounds need engineer-in-charge approval (Cl 13.5.2). A dry day in the log is a durability event, not a formality.
Blank register for site use. Acceptance criteria cited from the Indian Standards named above — align with your project specification before contractual use.