Site QA/QC Formats Library
The registers, checklists and plans a concrete QA/QC engineer actually maintains — every acceptance line referenced to its Indian Standard, every format downloadable as Excel and printable as PDF. Built from our audit and training practice; free for site use.
Cube Test Register
Compressive-strength register for site/RMC cubes with the IS 456 Table 11 verdict computed per group of 4.
IS 516 (Part 1/Sec 1):2018 · IS 456:2000 Cl 15.2, 16.1 & Table 11
Concrete Pour Card
Single-pour authorization card: mix, quantities, placement plan, weather checks and hold-point sign-offs before, during and after the pour.
IS 456:2000 Cl 13, 14.1 · IS 7861 (Part 1)
Pre-Pour Checklist
25-point gate before concrete leaves the mixer — rebar, formwork, joints, materials, weather, plant and paperwork.
IS 456:2000 Cl 11, 13 · IS 14687 · IS 3558
Rebar Inspection Checklist
Reinforcement acceptance before cover: bars, spacing, laps, hooks, chairs and drawings discipline.
IS 456:2000 Cl 26 · IS 1786:2008 · IS 13920:2016
Non-Conformance Report (NCR)
Raise, disposition and close non-conformances with evidence — the QA loop that turns failures into records, not arguments.
ISO 9001 §10.2 · ConcreteInfo QA practice
ITP — Concrete Works
Inspection & Test Plan for RCC: activities, reference clauses, acceptance criteria, hold/witness points and records.
IS 456:2000 · IS 2502 · IS 14687 · IS 516 · IS 1199
Curing Log
Day-by-day curing evidence per member — method, weather, actions and cumulative days against the IS 456 minimum.
IS 456:2000 Cl 13.5, 13.5.1, 13.5.2
Material Receiving Report (MRR)
Gate acceptance for cement, SCM, aggregates, admixtures and steel — certs, lots, samples and verdicts before anything enters storage.
IS 269 · IS 383 · IS 3812 · IS 9103 · IS 1786