IS 13311.

UPV and rebound hammer — two tests, one purpose: estimate uniformity and approximate strength of in-place concrete without breaking it.

AH
Amit Haridas
Founder · ConcreteInfo
| September 12, 2026| 12 min read
IS 13311 NDT UPV · REBOUND HAMMER · UNIFORMITY ULTRASONIC PULSE VELOCITY IS 13311 Pt 1 · 54 kHz transducers concrete member TX RX L = path length (mm) V = L / t (km/s) REBOUND HAMMER IS 13311 Pt 2 · spring-loaded scale concrete impact ≥ 9 readings / area PULSE VELOCITY IS 13311 Pt 1 grading > 4.5 km/s · excellent 3.5-4.5 · good 3.0-3.5 · medium (suspect) < 3.0 · poor (doubtful) uniformity check · not strength IS 13311 (Pt 1 & Pt 2):1992 · IS 516 · IS 456

Codes referenced

IS 13311 (Part 1):1992
NDT of Concrete — Ultrasonic Pulse Velocity

Apparatus, procedure, pulse-velocity grading and interpretation.

IS 13311 (Part 2):1992
NDT of Concrete — Rebound Hammer

Apparatus, procedure, test-grid layout, calibration against cubes.

IS 516 (Part 5/Sec 1):2018
Hardened Concrete — UPV test method

Detailed test procedure that IS 13311 Pt 1 references.

IS 516 (Part 5/Sec 4):2018
Hardened Concrete — Rebound Hammer

Test procedure referenced by IS 13311 Pt 2.

UPV — what the test does and doesn't tell you

UPV measures the velocity of an ultrasonic pulse through concrete. Velocity depends on the concrete's elastic modulus and density — both of which correlate with compressive strength but only weakly. The pulse travels fastest through dense, defect-free concrete and slows on voids, cracks, or poor compaction.

The key distinction: UPV gives uniformity and detects defects; it does not directly give strength. A 4.0 km/s reading tells you the concrete is uniform and free of large voids; it does not tell you whether the strength is 30 MPa or 40 MPa without site-specific calibration.

Pulse velocity interpretation (IS 13311 Pt 1 §6)

Pulse velocity (km/s)Concrete qualityAction
> 4.5ExcellentAccept — sound, dense
3.5 – 4.5GoodAccept — slight porosity possible
3.0 – 3.5SuspectInvestigate — possible voids, cracks
< 3.0DoubtfulCore test and structural review

Reference: IS 13311 Pt 1 §6 grading (above values typical for normal-weight concrete; values shift with aggregate type and moisture content).

Transducer arrangement

Three arrangements, in order of reliability: direct (through) — transducers on opposite faces, most reliable; semi-direct — transducers on adjacent faces; indirect (surface) — both on same face, least reliable (used when access to opposite face is blocked). Path length L is measured to nearest 1 mm; transit time t to nearest 0.1 microsecond.

Rebound hammer — when and when not to use it

The rebound (Schmidt) hammer fires a spring-loaded mass against the concrete surface and measures the rebound distance. Harder concrete rebounds more. The result is a number on a 0-100 scale called the rebound index (R).

Test-grid and reading rule

  • · Grid of ≥ 9 points in a 300 × 300 mm area; points ≥ 25 mm apart and ≥ 50 mm from edges
  • · Each point: 3 readings within a 30 mm circle, take the median
  • · Discard any reading > 6 below the median (low outlier)
  • · Discard any reading > 1.4× the median (high outlier)
  • · Average the remaining readings for the area's R

Why site calibration matters

The rebound-strength correlation that the manufacturer prints on the hammer is generic — a typical curve for generic concrete, generic aggregate, generic cement. Your project has specific aggregate, specific cement, specific moisture at test time. Without a site-specific calibration (rebound R on a cast cube vs cube compressive strength), the rebound reading is only useful for relative comparison: is column A stronger than column B? It is not good enough for acceptance: does this column meet fck = 30 MPa?

Field practice — what to actually do at site

Always

Calibrate UPV transducers with a reference bar before each shift. Hold transducers firmly against smooth surfaces (use coupling paste). For rebound, smooth the test area with a carborundum stone, hold the hammer perpendicular to the surface, take 9+ readings per area.

Never

Test on wet surfaces (UPV slows 5-10% on saturated concrete). Use rebound readings as acceptance without site calibration. Test on honeycombed or scaled surfaces without grinding first. Test rebars with cover meter before UPV — rebar disturbs the wavefront.

Worked example — UPV uniformity survey on a slab

Scenario. Suspect low-strength readings on a 28-day slab pour (cube average 26 MPa, target 30 MPa). UPV survey in a 5×5 grid on the slab soffit (direct arrangement, 250 mm path).

ReadingTransit t (µs)Velocity (km/s)Action
1-9 (lowest 20% discarded)60 - 723.47 - 4.17 (mean 3.85)Accept — within "good" range, uniform
10-2562 - 753.33 - 4.03 (mean 3.72)Accept — same range
26 (one outlier)1281.95Investigate — likely a crack or void

Decision: the slab is uniformly "good" per UPV. The low cube strength is a strength issue, not a quality issue — likely caused by high w/c at the plant, not by voids or cracking. Core-test the suspect area to confirm, then accept with mitigation on future pours. The single 1.95 km/s reading is the outlier that triggers a localised core test on that 1 m².

Common deviations seen on Indian sites

· Reading rebound as strength

"R = 34 → 34 MPa." Without site calibration, the rebound number gives uniformity, not strength. Use cores for acceptance decisions.

· Testing on wet surface

Concrete just dewatered or curing-sprayed reads 5-10% lower in UPV. Dry the surface or wait.

· No transducer calibration bar

Transducers drift. Run the reference bar daily; replace transducers if zero-point shifts.

· Indirect arrangement used without correction

Indirect (surface) UPV underestimates direct UPV by 5-15%. Apply the calibration factor or use direct arrangement.

Field-checklist blocks

A short questionnaire, an inspector's checklist, and three worked examples that show how the UPV and rebound readings resolve into a decision to investigate, to re-test, or to cut a core.

Questionnaire — asked before the NDT survey starts, once the question is written down

  1. What is this survey being asked to answer? UPV gives uniformity and finds voids and cracks. It does not give strength, so the question decides which test you should be running.
  2. What is the transducer arrangement, and has the reference bar been run today? Direct, semi-direct and indirect are not interchangeable, and transducers drift.
  3. Is the surface dry and smooth? UPV slows 5 to 10% on saturated concrete, and honeycombed or scaled surfaces have to be ground before they are tested.
  4. Have the rebars been located with a cover meter before the UPV run? Rebar disturbs the wavefront.
  5. If the arrangement is indirect, where is the 5 to 15% correction being applied? Indirect underestimates direct by that much.
  6. How many readings per test area? For UPV, at least 9 readings in a grid, discarding the lowest 20% and averaging the rest. For the rebound hammer, at least 9 points in a 300 × 300 mm area.
  7. Has the rebound hammer been calibrated against cubes cast from the same concrete? Without that, the rebound number answers "is this pour weaker than the one next to it?" and not "does this member meet fck?".
  8. If a low-strength suspicion is under investigation, who is cutting the cores? IS 516 Pt 4. NDT flags the suspect area; cores prove the strength.

Inspector's checklist — what to verify on site

  1. Reason for the survey written down before the first reading, along with the acceptance question it has to answer.
  2. Every UPV reading recorded with its inputs: path length L to the nearest 1 mm and transit time t to the nearest 0.1 microsecond.
  3. Transducers zeroed on the reference bar before each shift, and replaced if the zero-point shifts.
  4. Surface prepared before testing: ground where honeycombed or scaled, dried where wet, coupling paste used, transducers held firmly against the surface.
  5. Grid layout recorded with its spacing and its coverage, as in the slab soffit example where a 5 × 5 grid was run on a 250 mm direct path.
  6. Grading applied to every reading and every suspect zone marked: above 4.5 km/s excellent, 3.5 to 4.5 km/s good, 3.0 to 3.5 km/s suspect, below 3.0 km/s doubtful.
  7. Rebound readings taken to the rule: at least 9 points in a 300 × 300 mm area, points at least 25 mm apart and at least 50 mm from the edges, 3 readings within a 30 mm circle at each point with the median taken, outliers more than 6 below the median or more than 1.4 times the median discarded, and the remainder averaged.
  8. No rebound-to-strength conversion used for acceptance without a site-specific calibration against cubes from the same concrete.

What happens if… three worked examples

Example 1 — a 5×5 UPV grid on a slab soffit, direct arrangement, 250 mm path

What happens. Readings 1 to 9 give transit times of 60 to 72 microseconds, so the velocity is L / t: 250 / 60 = 4.17 km/s at the fastest and 250 / 72 = 3.47 km/s at the slowest, a mean of 3.85 km/s. Readings 10 to 25 run 62 to 75 microseconds, giving 250 / 75 = 3.33 km/s to 250 / 62 = 4.03 km/s, a mean of 3.72 km/s. Both groups sit in the 3.5 to 4.5 km/s good band.
Likely outcome. The slab is uniformly good, so the low cube strength (26 MPa against a 30 MPa target) is a strength problem rather than a void or cracking problem, and the plant's w/c is where you look. The one reading at 128 microseconds gives 250 / 128 = 1.95 km/s, well below the 3.0 km/s doubtful threshold, so that 1 m² gets a localised core and the rest of the slab does not.

Example 2 — the survey runs on a surface that was curing-sprayed that morning

What happens. Concrete that was just dewatered or curing-sprayed reads 5 to 10% lower in UPV, so a wet-surface number is not the number. A grid reading 3.4 km/s on the wet surface sits somewhere between 3.4 / 0.95 = 3.58 km/s and 3.4 / 0.90 = 3.78 km/s on a dry surface, which is inside the good band (3.5 to 4.5 km/s) at both ends.
Likely outcome. The 3.4 km/s reading has been classified as suspect, so you go hunting for voids in sound concrete and find none, and how many you "find" depends on how wet the surface was that morning. Worse, the same slab gives a different answer on a different day, so nobody can reproduce the survey. Dry the surface or wait, then re-run the grid before a single zone is graded.

Example 3 — the site writes "R = 34 → 34 MPa" and wants to close the pour

What happens. The manufacturer's curve is generic: generic concrete, generic aggregate, generic cement. The same concrete can read 28 MPa one day and 35 MPa another depending on surface moisture, carbonation depth, hammer angle and aggregate type. That is a 7 MPa spread (35 − 28) coming from the rebound number alone, on the same concrete.
Likely outcome. The reading is not an acceptance number and won't be used as one. Use the rebound as a comparative flag, this pour is weaker than the adjacent one, so investigate, and let cores under IS 516 Pt 4 carry the acceptance decision. Writing "34 MPa" next to a rebound reading is one of the most common misuses of the instrument on Indian sites.

Frequently Asked Questions

What does an ultrasonic pulse velocity (UPV) reading of 4.0 km/s tell me?
Per IS 13311 Pt 1:1992, pulse velocity > 4.5 km/s is excellent, 3.5-4.5 is good, 3.0-3.5 is medium (suspect), < 3.0 is poor (doubtful). A 4.0 km/s reading falls in "good" — concrete is sound but the test alone does not give strength; it gives uniformity and detects voids/cracks.
Can a rebound hammer reading be converted to cube strength?
Not directly without site-specific calibration. IS 13311 Pt 2 acknowledges the rebound-strength correlation is approximate. Without calibration against cubes on the same concrete, use the rebound reading only for relative comparison, not for acceptance.
How many readings does IS 13311 require for one test area?
UPV: ≥ 9 readings per test area in a grid; discard lowest 20%, average the rest. Rebound: ≥ 9 readings per area, discard outliers (more than 6 below median, or any above 1.4× median), average the remaining 5+ readings.

Related articles

AH
About the author

Amit Haridas

Founder & Proprietor, ConcreteInfo. 25+ years experience in construction QA/QC, concrete technology, RMC plant operations, consulting and technical training across India. For an NDT investigation or low-strength dispute review, contact amit@concreteinfo.in.

Newsletter

Technical updates, not sales emails

One email when a new article goes out on concrete technology, QA/QC and construction quality. No promotions, and your address is never sold or passed to advertising networks. Subscribing is separate from making an enquiry.

You are on the list.

One email when a new article goes out. Every issue carries an unsubscribe link.

Need hands-on help?

Reading is one side.
Building is the other.

NDT surveys, low-strength investigations, core cutting and IS 13311 audit on your project — we cover the rest.